Beijing 3,000 m² SAC Biopharmaceutical Cleanroom

Completed in Beijing in 2023, this 3,000 m² SAC cleanroom supports biopharmaceutical operations and targets ISO 8 cleanliness.

This Beijing project delivered 3,000 m² of clean space for a biopharmaceutical client in 2023. The brief called for ISO 8 conditions across a large area, with zoning that could be assembled efficiently within the existing site. A site-assembled modular cleanroom was selected to organize the space around the client's operating requirements. The package combined cleanroom wall panels and cleanroom ceiling systems with HVAC, filtration, lighting, electrical services, automation, and monitoring. Coordinating these elements as one scope helped define the interfaces between rooms and services before installation. On-site assembly was followed by commissioning and validation work. The recorded delivery period was six months. This case illustrates how the SAC approach can address a large biopharmaceutical footprint while keeping the enclosure, environmental systems, and site work aligned. The published information does not identify the client or disclose process-specific details.

Beijing 3,000 m² SAC Biopharmaceutical Cleanroom
3,000 m² Area controllata
6 months Consegna
ISO 8 Classe cleanroom
01
LA SFIDA

Gestire i vincoli reali del progetto

Create approximately 3,000 m² of ISO 8 biopharmaceutical clean space with large-area zoning and efficient site assembly.

02
LA SOLUZIONE

Progettata per il processo

A site-assembled SAC modular cleanroom was delivered for approximately 3,000 m² of ISO 8 biopharmaceutical space in Beijing.

AMBITO DELLA FORNITURA

Un pacchetto cleanroom coordinato

Il pacchetto di progetto è stato coordinato come sistema completo, mantenendo allineate le interfacce architettoniche, meccaniche e di controllo dalla progettazione alla qualifica.

  • 01Site-assembled modular walls and ceiling for a 3,000 m² biopharmaceutical cleanroom
  • 02HVAC and filtration serving the ISO 8 clean space
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site assembly, commissioning and validation